10 kW Solar System Price in Peshawar
10 kW Solar System Price in Peshawar
As electricity, charges keep rising and energy outages stays a subject in many Pakistani cities, families and agencies in Peshawar are increasingly considering solar electricity. A 10-kilowatt (kW) solar system is frequently seen as a
“candy spot” large sufficient to energy many appliances, perhaps some ACs, lighting, fans and so forth. However, not so massive that installation turns into wildly steeply priced. Below is a breakdown of what a 10 kW system fees, what determines the fee, and what you should do not forget earlier than making the decision.

Current Market Rates
- The typical price for a 10 kW solar system in Pakistan in 2025 is generally in the range of
PKR 1,300,000 to PKR 1,500,000 for an on-grid system (i.e. one without batteries).
- If you want off-grid (with batteries) or a hybrid system that can store energy and feed excess into the grid, the cost is higher — roughly
- PKR 1,500,000 to PKR 1,700,000 for off-grid; hybrid systems may go up to ~PKR 1,800,000.
- In Peshawar specifically, the per-watt cost for solar panels is reported to be somewhat higher than some other cities, typically around
- PKR 31-34/Watt for good quality panels. Local estimates for a 10 kW system (including inverter, mounting, installation etc.) in
- Peshawar are often in the PKR 800,000 to PKR 1,000,000 region under certain conditions (e.g. lower quality panels, simpler installation). However, that range tends to exclude batteries or higher-end components.
So depending on the quality, features, brand, whether batteries are included, and whether you do net metering or not, the cost can vary quite a bit.

What Determines the Price?
Several factors affect how much you will pay:
- Panel Brand and Quality
Tier-1, high-efficiency, mono-crystalline or bifacial panels cost more per watt than lower efficiency or lower-grade panels. If you go for well-known international brands (Longi, Jinko, JA, etc.), expect to pay more Inverter
Type and Quality
On-grid inverters are cheaper; hybrid or off-grid inverters that support battery integration cost more. Warranty, efficiency, and features (e.g. monitoring) matter.
- Mounting Structure, Mounting Type, Installation Complexity
Roof type, structural strength, angle, shading etc. will affect how much steel or framework is needed, what kind of labor is involved. If you have complicated mounting (steep roof, shaded areas, etc.), cost goes up.
- Batteries (if any)
Off-grid or hybrid systems require batteries; these add substantially to the cost. Technology (lead-acid vs lithium), capacity, and brand all affect price.
- Local Costs, Transport, Import Duties
Peshawar receiving goods from importers, customs/duties, transportation from port, local labor, etc., all add cost. Also currency fluctuations affect prices of imported panels and inverters.
- Net-Metering and Meter Costs
If you want a “green meter” or net-metering connection, there can be additional cost for paper work, installation of special meter, etc.
What You Can Expect in Peshawar
Putting all this together, if you are considering installing a 10 kW on-grid solar system in Peshawar with decent components (good quality panels, a reliable inverter, proper installation, but without batteries), you should plan for somewhere between:
- PKR ~1,300,000 to 1,500,000
If you include batteries or go hybrid/off-grid, add another PKR 200,000 to 400,000+, depending on battery capacity and quality.
If cost is an issue and you are willing to use lower-grade panels or simpler installation, you might find quotations closer to PKR 900,000-1,100,000, but with trade-offs in efficiency, warranty, or lifespan.
Payback and Value
- If utility rates are high, and solar gives you consistent production, such an investment might pay for itself in 4-7 years (or more), depending on usage, net metering, electricity price, and how much solar power you use vs export.
- Maintenance is needed (panel cleaning, inverter upkeep etc.), but solar panels generally last 20-25 years.
Final Recommendations
- Get multiple quotes from local installers in Peshawar, specifically asking for breakdowns: how much for panels, structure, inverter, wiring, installation, batteries (if included), meter, etc.
- Ask about warranties (panels, inverter).
- Consider net-metering if available and it can help reduce payback time.
- Think carefully about battery vs on-grid: battery adds cost and maintenance.